Rolling Stock System for MLRT Seac Pai Van and Hengqin Extension
The project covers two extension lines to existing Macau Light Rail Taipa Line: A 1.6km extension (with 2 stations) connecting the Taipa Line to Seac Pai Van, and a 2.2km extension (with 2 stations and via a 900m long underwater tunnel) connecting Taipa Line to Hengqin Station.
Top Builders is responsible for the installation of the mechanical works which generally consists of the track works, guiderails/powerdrails and the emergency walkway
Top Builders Macau is glad to announce it’s third railway project, Top Builders is working with Mishibishi and Hou Chun as a Consortium for this project. Due to the high precision requirements of the light rail system, the rail installation tolerance must within a few millimeters or even zero tolerance. The accuracy and quality works done by Top Builders had been recognized by Consultants and our Clients before, we will keep up our good work!