Venetian Macao Resort (Parcel 1)
項目 :
Venetian Macao Resort (Parcel 1)
The Venetian Macao Resort is one of Asia’s most exciting entertainment destinations and is one of the 10 largest buildings in the world with a total floor area of 1,000,000 m2.
Top Builders successfully delivered numerous work packages on this mega project including bored and PPC piling, substructure, superstructure, structural steelwork, ABWF and fit-out works from commencement of construction in June 2004 until the opening of the resort in Aug 2007.
The total project value undertaken by Top Builders in this project is approximately MOP 650m.
Work Packages Undertaken |
Land Reclamation (Parcels 1, 2 & 3) |
Hotel Bored Piles and Substructure |
Theatre ABWF |
Events Centre ABWF |
Hotel BOH ABWF |
Hotel Bathrooms Prefab Finishing Works |
VIP Roof Garden Structure and Fit-out |
Pool Deck Substructure and Superstructure |
PPC Piling for External Works |
Congress Centre Substructure |
Podium Substructure (South) |
Energy Centre Superstructure and ABWF |
Lagoon and Entrance Substructure |
Lagoon Water Membrane System |