Top Builders Group was recently awarded a contract by Venetian Macao Resort for the construction of a pedestrian link-bridge between Four Seasons Hotel (Venetian Parcel 2) and Sands Cotai Central (Venetian Parcel 5 & 6).
The link bridge is a steel structure supported by columns and pile foundation. It is of approximately 160m in length , fully air-conditioned, with travelators and observation decks, The envelope is completed with aluminium claddings and decorative louvres constructed under a design and build arrangement giving it a modernised outlook and rendered it one of the landmark structures in the area. So far, the footbridge is the only elevated link connecting both sides of the Cotai Strip.